作者:王龙杜
来源:原创
时间:2026-08-26
阅读:456596 次
火影忍者
Home-made C919 completes first international commercial flight, lands in Ulaanbaatar_我的网站

一 |

China's domestically developed C919 large passenger aircraft landed safely in Ulaanbaatar, capital of Mongolia, on Wednesday afternoon, marking the completion of its first international commercial flight.
At 3 pm, the C919 took off from Beijing Capital International Airport and arrived at Chinggis Khaan International Airport in Ulaanbaatar at 4:58 pm local time. Upon landing, the aircraft was greeted with a water cannon salute — the highest ceremonial honor in international civil aviation.
Starting from Wednesday, Air China's C919 began operating the Beijing-Ulaanbaatar round-trip route, with flight number CA723/4, at a frequency of 7 flights per week.
Currently, domestically produced C909 aircraft operates regular flights on the Hohhot-Ulaanbaatar round-trip route.
With the successful maiden flight of the C919 to Ulaanbaatar, the two types of domestically produced passenger aircraft have now achieved joint operations at an overseas airport, according to People's Daily on Wednesday.
Since the delivery of Air China's first C919 aircraft in August 2024, the fleet has steadily expanded. As of now, Air China's C919 fleet has grown to 12 aircraft, with a cumulative total of over 12,000 safe flights and more than 1.62 million passenger trips carried, the carrier said on Wednesday.
To date, C919 aircraft operated by Air China, China Eastern Airlines, and China Southern Airlines have cumulatively opened 58 routes, served 26 cities, and carried over 7.5 million passengers.
Since entering commercial service on May 28, 2023, the C919 aircraft has made appearances at overseas airshows, with participations in the Singapore Airshow twice and the Dubai Airshow once.
Global Times
。 经过12个小时的沥青摊铺,并连夜施划交通标线,10月21日早晨,顺城区永城街主路道路维修改造实现半幅封闭,有序通车。当日上午,施工单位抚顺中煤建设(集团)有限责任公司(以下简称“抚顺中煤”)在对永城街东西两侧的辅路进行沥青摊铺,中午左右,永城街维修改造道路施工项目基本完工,市政部门对道路中间隔离设施进行重新设置。 永城街道路维修改造自今年10月14日启动,北起黑大立交桥南,南至天湖大桥北引道,全长为1300米,主路宽为24米,双向6车道,辅路宽各为12米。

二 | 10月20日早晨,抚顺中煤对整个路面实施了封闭,启用4台路面摊铺机并排作业实施摊铺沥青,保证整个路面无接缝。 在路面摊铺沥青的施工过程中,抚顺交警部门增派了近20名警力,对施工封闭区域路口进行值守。随后,交警部门又连夜施划交通标线,确保车辆顺利通行。 抚顺中煤现场施工负责人介绍,他们还将对新城路东段,即永城街至长城街之间的长约1800米的路段,实施沥青摊铺作业,争取在保证施工质量的前提下,用最快的时间完成新城路东段维修改造任务,减少施工期间对周边百姓生产生活的影响。 责任编辑:李丹。
Current article:http://09b.jiubengtaibingpengou.pics/4g3/20260826/715431.html
Published on:15:21:50








